<cite id="dbtld"><span id="dbtld"><ins id="dbtld"></ins></span></cite><strike id="dbtld"></strike>
<strike id="dbtld"><i id="dbtld"></i></strike>
<strike id="dbtld"><i id="dbtld"><del id="dbtld"></del></i></strike>
<span id="dbtld"></span><strike id="dbtld"><i id="dbtld"><del id="dbtld"></del></i></strike>
<span id="dbtld"><dl id="dbtld"></dl></span>
<ruby id="dbtld"><video id="dbtld"><ruby id="dbtld"></ruby></video></ruby>
<strike id="dbtld"><i id="dbtld"><cite id="dbtld"></cite></i></strike>
<strike id="dbtld"><i id="dbtld"><del id="dbtld"></del></i></strike>
<strike id="dbtld"><i id="dbtld"></i></strike>
<strike id="dbtld"></strike><strike id="dbtld"><dl id="dbtld"></dl></strike>
<strike id="dbtld"></strike>
<strike id="dbtld"><dl id="dbtld"></dl></strike>
<span id="dbtld"><dl id="dbtld"><strike id="dbtld"></strike></dl></span>
<progress id="dbtld"><video id="dbtld"><ruby id="dbtld"></ruby></video></progress>
| | English 前, 要設定延遲翻譯時間, 如100表示100ms,默認為0 var cookieDomain = "http://hyu2902120001.my3w.com/"; //Cookie地址, 一定要設定, 通常為你的網址 var msgToTraditionalChinese = "繁體"; //默認切換為繁體時顯示的中文字符 var msgToSimplifiedChinese = "簡體"; //默認切換為簡體時顯示的中文字符 var translateButtonId = "translateLink"; //默認互換id translateInitilization();

Press Release - L&K’s Hefei Changxin Project

date:2020-07-20????browser:177
Hefei Changxin 12-inches Memory Wafer Manufacturing Base Project was founded in June, 2016. With a total investment of about 150 billion Yuan, the project is an industrial project with the largest single investment in Anhui Province. It will be built into the first and the largest self-developed DRAM manufacturing base in China and also the fourth manufacturer adopting 20 nanometers or lower technique for DRAM in the world. The design production capacity of the first phase is 120,000 wafer per month.
 
In the construction of Hefei Changxin project, the project management team of L&K has been working hard without complaint all the time during the implementation process. They have been diligent and actively overcome the on-site difficulties, and their safety management has been recognized by the owner.
 
The owners of Changxin Integration and IT Electronics Eleventh Design & Research Institute Scientific and Technological Engineering Corporation Limited (“EDRI”) conducted an annual evaluation among 20 professional subcontractors on Production Safety Month in 2020. The project team of L&K won the first prize in the evaluation, and won the certificate and trophy of “ First Prize for Annual Production Safety Month Evaluation in 2020” awarded by the owner of Changxin Integration.
 




Foucs

Copyright ? 2018 by lkeng. All rights reserved. 蘇ICP備17037805號-1 Tel 86-512-67027000